PROPOSAL FOR ONLINE SERVICES

 

The strengthening of the KWA has to be started from the Section offices because of direct public relations are through the Section office. Most of the Section offices are functioned with insufficient Overseers, office space and infra-structure facilities. All the public and representatives of the local bodies in the different standards are directly approaching the Section offices for their grievances related to water supply. But due to the unscientific assignment of duties, inadequate staff and infra structure felicities not attained the fulfillment of the consumer satisfaction from the Section offices.

The existing e abacus software is time consuming and not users/customers friendly in accordance to the Water Supply Act. There is no provision to correct or edit the wrong entry made in the lower level, rejection on verification and inform the position of application in each table. The not required fields are seen provided as mandatory. The pending list listed is seen not in order of seniority and the licensed plumbers list is not in alphabetic order of name.

Recently it is seen that the video regarding the JJM Water service connections are in circulation and it is not known whether it is authenticated or not. As per this video, some data are to be collected using mobile app. For this smart phone with data connections are to be provided. If modified the e abacus software, data regarding the applicant including verification details can be entered using system at office.

Proposal for modified software

1.     The proposed software should be users, customers friendly and it can be moved from one field to another automatically or by using Enter Key.

2.     The fields can be provided as mandatory and optional. The required details only as per Water Supply Act may be provided as mandatory.

3.     The stage of application can be understood in every table. (Searching may be adopted)

4.     The wrong entry in the lower level can be edited or corrected from the next higher level.

5.     To be provided the automatic generation of acknowledgement receipt, Provisional Approval Notice/ Rejection memo etc. by message to the applicant and Application for road cutting sanction, agreement, Work order etc. The further copies of the above can be taken if required.

6.     To be provided the facilities for rejection on verification if not feasible.

         

Proposed procedure for granting New Water Service Connections

Application for water connection shall be submitted by online attached with:-

1.     Ownership certificate from Local body (Residential certificate and other kinds of any certificate may not be considered.)

2.     Copy of ID proof (Voter ID card/Driving License/Aadhar card etc.)

Proposed procedure for simplifying and smooth functioning

1.     The applications submitted by online shall be opened by the Draftsman/Overseer authorized by the Assistant Engineer and registered on preliminary checking. On registration/rejection, message will be generated to the cell phone of the applicant with seniority number as the case may be.

2.     The Draftsman/Overseer will be submitted the verification report with recommendation of the connection if feasible, and if found not feasible, the fact shall be reported to the Assistant Engineer with reasons.

3.     Based on the approval of the Assistant Engineer, Provisional Approval Notice/ Rejection memo are generated automatically.

(The applicant shall be requested through message to furnish the consent letter of the owner of land through which the pipe lines are to be laid, sanction for road cutting from PWD/Local Body etc. as the case may be, stamp paper for agreement, original ID proof and to remit the connection charges, CSME charges etc. as per Water Supply Act.)

4.     The applicant shall be produced the required consent/road cutting sanction as the case may be, original ID proof, stamp paper etc. before the Draftsman/Overseer for verification of agreement documents.

5.     On verifications with check lists, system will be generate agreement conditions and  put up the agreement documents before the Assistant Engineer for the execution of agreement with applicant.

6.     On remittance of the required fee and execution of agreement, work order will be generated automatically.

7.     The Overseer shall be arranged the connection through the Licensed Plumber and entered the data of connection to the system.

(The consumer number will be generated only on entering the physical date of connection and not on payment of connection fee)